Kiln Foundation Construction circa 1989
Dug the hole
Poured 16" wide concrete footers, 3' below grade
Two rows of 8" concrete block were laid and bonded together
The slab will sit on the inner course while the stone face and
brick structure will lay on the outer course of block
The stone face and brick cap:
Backfilled and graded, utilities installed, ready for concrete.
Pouring the concrete slab
Finished slab and retaining wall in the morning sun
Early Raku Games
Building the walkway back to the house with French drains
Finished sidewalk back to the house